Job work ka rate kaise tay karein

Party beam aur vana deti hai, aap loom, karigar aur bijli. Bhaav dene se pehle pata hona chahiye ki ek meter pe aapka apna kharcha kitna hai — warna loom chalte rahenge aur munafa nahi bachega.

Job work mein yarn party ka hota hai — aapka kharcha "conversion" ka hai: kapda bunne ka. Isliye job ka bhaav yarn ke rate se nahi, aapke loom ke ek din ke kharche se banta hai. Wahi kharcha meter pe baanto, wastage aur munafa jodo, aur phir ₹ per meter ya paise per pick mein bolo.

Apna kharcha per meter

Pehle ek loom ka roz ka meter nikalo:

Meter per din = RPM × 60 × ghante × efficiency ÷ (PPI × 39.37)

Phir har kharche ko ₹ per meter mein badlo:

Udaharan

Quality 50 pick, loom 600 RPM, 85% efficiency, do shift 12 ghante ki. Roz ka meter: 600 × 60 × 24 × 0.85 ÷ (50 × 39.37) = 373.08 m. Neeche ke saare kharche sirf udaharan hain — apne unit ke number daalo.

KharchaHisaab₹ / meter
Pagaar₹0.80 per meter0.80
Bijli2.5 kW × 24 × ₹8 = ₹480 ÷ 373.081.29
Overhead₹9,000 / loom / mahina ÷ 30 = ₹300 ÷ 373.080.80
Ghisaai₹12,000 / loom / mahina ÷ 30 = ₹400 ÷ 373.081.07
Beam ka kaam₹1,200 per beam ÷ 6,000 m0.20
Mending, foldingper meter0.10
Kul kharcha4.26
  • Wastage: 2% meter fent ya B grade mein jaata hai jiska poora bhaav nahi milta → 4.26 ÷ 0.98 = ₹4.35
  • Munafa 15% (bhaav pe): 4.35 ÷ 0.85 = ₹5.12 per meter
  • Paise per pick mein: 5.12 × 100 ÷ 50 = 10.24 paise — quote 10.5 paise per pick
  • 10.5 paise pe: 50 × 10.5 ÷ 100 = ₹5.25 per meter, yaani ₹266.70 per lakh pick
  • Ek loom ki kamai: 5.25 × 373.08 = ₹1,958.65 roz, 30 din mein lagbhag ₹58,759

Yahi conversion Job rate calculator mein karke dekho — paise per pick, ₹ per lakh pick aur ₹ per meter teeno saath.

Per meter ya per pick?

Bijli, overhead aur ghisaai samay ke kharche hain — loom ek din chale toh utne hi. Zyada pick wali quality pe roz ke meter ghat jaate hain, toh in kharchon ka per meter hissa badh jaata hai. Isliye Surat mein job ka bhaav aksar paise per pick mein bolte hain.

Udaharan

Wahi loom 60 pick pe: roz ke meter 373.08 × 50 ÷ 60 = 310.90 m. 10.5 paise per pick = 60 × 10.5 ÷ 100 = ₹6.30 per meter, aur roz ki kamai 6.30 × 310.90 = ₹1,958.67 — pehle jitni hi (fark sirf rounding ka). Agar ₹5.25 per meter fixed rakha hota toh roz sirf lagbhag ₹1,632.

Dhyaan do: "paise per pick" ka matlab yahan ₹ per meter = PPI × paise ÷ 100 hai. Har party ya broker isi tarah nahi ginta — basis ek baar likhit mein pakka karo.

Quote dene se pehle checklist

Aam galtiyaan

Loomiro mein

Party ka beam Beam Stock mein source "Job" ke saath aata hai, aur uska vana yarn Job Party Stock mein — bacha yarn "Job yarn wapas" se lautta hai. Us beam ke taka se Job Work Bill banta hai, aur job work ka ITC-04 CSV mein. Costing mein bijli, pagaar, overhead, beam aur baaki kharche daalo — conversion ₹ per meter aur job bhaav paise per pick seedha dikhta hai. Ghisaai ko overhead mein jod do.

Is guide ke saare kharche, rate aur munafa sirf udaharan hain — bazaar ka bhaav nahi. Apne unit ke number se hisaab karo.